Overview
A kitchen remodel can mean anything from new cabinet fronts and counters to a full gut renovation that moves walls, plumbing and gas lines. The scope you choose drives nearly everything else: timeline, permits, which trades are involved and how long you will be without a working kitchen. Being clear about your goals, such as more storage, better workflow, more seating or simply updating finishes, helps contractors give you comparable proposals.
Most full remodels follow a similar sequence. Design and selections come first, then permits where required, demolition, rough-in work for plumbing, electrical and ventilation, inspections, drywall, cabinet installation, countertop templating and fabrication, backsplash and tile, appliance installation and finishing work. Countertops are usually templated after cabinets are installed, which is one reason kitchens can't be rushed even when the crew is ready.
Layout changes have the largest ripple effects. Moving a sink means moving drain and vent lines, moving a range may require new gas or electrical service and a different ventilation path, and removing a wall may require structural engineering. Keeping major fixtures in place often saves time and money, but a better layout may be worth the extra work for how you use the space every day.
How it typically works
- Rough-in, cabinets, countertops and finish work in sequence.
- Measurements and design, which may include drawings and 3D renderings.
- Demolition and protection of the rest of the home from dust.
- Permits and inspections for plumbing, electrical, structural and mechanical work where required.
- Initial consultation to discuss goals, budget range and how you use the kitchen.
- Selections for cabinets, counters, flooring, fixtures, lighting and appliances.
Before you decide
- Older homes can hide surprises. Outdated wiring, plumbing or materials that require special handling may be found during demolition.
- Ventilation is often overlooked. Range hoods should be sized for the cooking appliance and vented appropriately.
- Fixed-price and cost-plus contracts work differently. Understand what is included and how changes are priced.
- Allowances in a bid are placeholders. If your selections exceed them, the cost increases.
- Electrical capacity may need upgrades for new appliances, lighting and outlets.
- Contingency matters. Many remodelers suggest setting aside a portion of the budget for unexpected conditions.
Local notes for Colorado's Front Range
Basements are common in Colorado homes, which makes basement finishing a frequent project. Radon is present in many parts of Colorado, and state health officials recommend testing homes.
We take inquiries from Fort Collins, Boulder, Denver, Colorado Springs, Pueblo.
How to prepare your inquiry
- Think about timing, including any dates you need the space usable, and whether you will live in the home during the work.
- Have a budget range in mind, even a rough one, so a provider can suggest realistic options.
- Note who will make decisions and be available to answer questions during the project.
- Note the approximate age of the home. Older homes can involve outdated wiring, plumbing or materials that need special handling.
- Mention whether you plan to keep the current layout or move plumbing, walls or appliances, since that drives scope and cost.
When to keep looking
- Vague answers about who will actually do the work and who supervises it.
- Suggestions to skip permits on work that normally requires them.
- A very large deposit requested before any work or ordering is scheduled.
- No written contract describing scope, materials, schedule, payment terms and change-order process.
- No written warranty terms for workmanship.
What to ask before you commit
- Do you handle design, or should I work with a separate designer?
- Who pulls permits, and which inspections will be needed?
- What is your estimated timeline, and what could delay it?
- How are change orders priced and approved?
- Which items in your proposal are allowances, and what do they assume?
- Who will be on site each day, and who is my main point of contact?
- What warranty do you offer on workmanship?
- Are you licensed and insured as required where I live?
Quick answers
- Do I need a permit for a kitchen remodel?
- Permit needs depend on local rules and the work involved. Plumbing, electrical, structural and mechanical changes commonly require them.
- Should I buy appliances before the remodel starts?
- Choosing appliances early helps with cabinet design, since dimensions and ventilation needs affect layout. Delivery timing can be coordinated with your contractor.
- How can I keep costs under control?
- Keeping plumbing and appliances in their current locations, finalizing selections before work starts and limiting changes mid-project are common strategies.
Related topics
- Flooring: Choosing and installing flooring throughout a home, and questions to ask a flooring contractor.
- Whole-Home Renovations: What whole-home renovations involve, how to phase them, and questions to ask a general contractor.
- Home Additions: Planning a home addition, from zoning and design to construction, and questions to ask a contractor.
Tell us a little about what you need, and we'll get back to you about kitchen remodels.